Jefferson Interchange Notice of Work, 6/12/17 – 6/16/17

Ramp closures will take place on I-10 at Jefferson Street June 12 - 16. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, June 12 - 16, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Monday through Friday, June 12 - 16, 2017. 7:00 PM - 7:00 AM

WB off-ramp day:

Monday through Friday, June 12 - 16, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street June 12 - 13. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Night full closure of EB on-ramps and off-ramps.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Night full closure of WB on-ramps and off-ramps.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Monday and Tuesday, June 12 - 13, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of EB I-10.

  1. Exit at Washington St. and turn left.
  2. Turn right at Varner. Rd.
  3. Turn right at Monroe St.
  4. Turn left at Monroe St. on-ramp.

Detour for full closure of WB I-10.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.
  3. Continue to Washington St. on-ramp.

Jefferson Interchange Notice of Work, 6/5/17 – 6/9/17

Ramp closures will take place on I-10 at Jefferson Street June 5 - 9. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, June 5 - 9, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, June 5 - 9, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street June 5 - 9. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Night full closure of EB on-ramps and off-ramps.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Night full closure of WB on-ramps and off-ramps.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Monday through Friday, June 5 - 9, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of EB I-10.

  1. Exit at Washington St. and turn left.
  2. Turn right at Varner. Rd.
  3. Turn right at Monroe St.
  4. Turn left at Monroe St. on-ramp.

Detour for full closure of WB I-10.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

Continue to Washington St. on-ramp.

Jefferson Interchange Notice of Work, 5/30/17 – 6/2/17

Indio Blvd. will experience heavy traffic controls and lane restrictions May 30 - June 2. Please use alternate routes  if possible to avoid delays. The purpose of these restrictions  is to  pave the SB side of the new Jefferson St.

Restriction Schedule

Indio Blvd. day:

Tuesday - Friday, May 30 - June 2, 2017. 5:00 AM - 5:00 PM

 

Ramp closures will take place on I-10 at Jefferson Street May 31 - June 2. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Wednesday through Friday, May 31 - June 2, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Wednesday through Friday, May 31 - June 2, 2017. 7:00 PM - 6:00 AM

EB off-ramp day:

Wednesday through Friday, May 31 - June 2, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Thursday  and Friday, June 1 - 2, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

Jefferson Interchange Notice of Work, 5/22/17 – 5/25/17

Ramp closures will take place on I-10 at Jefferson Street May 22 - 25. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Thursday, May 22 - 25, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Wednesday and Thursday, May 24 - 25, 2017. 7:00 PM - 6:00 AM

EB off-ramp day:

Monday through Thursday, May 22 - 25, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Jefferson Interchange Notice of Work, 5/15/17 – 5/19/17

Ramp closures will take place on I-10 at Jefferson Street May 15 - 19. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, May 15 - 19, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.

Turn left at the EB I-10 on-ramp.

Jefferson Interchange Notice of Work, 5/8/17 – 5/12/17

Ramp closures will take place on I-10 at Jefferson Street May 8 - 12. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, May 8 - 12, 2017. 5:00 AM - 5:00 PM

WB loop on-ramp day:

Monday through Friday, May 8 - 12, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of WB I-10 Loop On-ramp at Jefferson St.

  1. Continue on Indio Blvd. north.
  2. Turn left at Varner Rd.
  3. Turn left at Jefferson St. south.

Turn right at the WB I-10 on-ramp.

Jefferson Interchange Notice of Work, 5/1/17 – 5/5/17

Lane closures will take place on I-10 at Jefferson Street May 1 - 5. The purpose of these closures is to demolish the NB Indio Blvd. Bridge.

Closure Schedule

Night full closure of EB I-10.

Nights of Monday through Wednesday, May 1 - 3, 2017. 8:00pm - 6:00am

Nights of Thursday through Friday, May 4 - 5, 2017. 9:00pm - 6:00am

Night full closure of WB I-10.

Nights of Monday through Wednesday, May 1 - 3, 2017. 8:00pm - 6:00am

Nights of Thursday through Friday, May 4 - 5, 2017. 9:00pm - 6:00am

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Detour for full closure of WB I-10.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave 42.

Continue on Varner Rd. to Washington St. on-ramp.

 

Ramp closures will take place on I-10 at Jefferson Street May 1 - 5. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, May 1 - 5, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Monday through Friday, May 1 - 5, 2017. 7:00 PM - 6:00 AM

EB off-ramp day:

Friday, May 5, 2017. 5:00 AM - 5:00 PM

WB off-ramp night:

Nights of Monday through Friday, May 1 - 5, 2017. 7:00 PM - 6:00 AM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

 

Jefferson Interchange Notice of Work, 4/24/17 – 4/26/17

Ramp closures will take place on I-10 at Jefferson Street April 24 - 26. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Tuesday through Wednesday, April 24 - 26, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Monday through Wednesday, April 24 - 26, 2017. 9:00 PM - 6:00 AM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.

Turn left at the EB I-10 on-ramp.

 

Lane closures will take place on I-10 at Jefferson Street April 24 - 26. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night full closure of EB I-10.

Nights of Monday through Wednesday, April 24 - 26, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Monday through Wednesday, April 24 - 26, 2017. 10:00pm - 6:00am

Night full closure of WB I-10.

Nights of Monday through Wednesday, April 24 - 26, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Monday through Wednesday, April 24 - 26, 2017. 10:00pm - 6:00am

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Detour for full closure of EB I-10.

  1. Exit at Monroe St. and turn right.
  2. Left at Varner Rd./Ave. 42.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp.

Note: Traffic will be flagged through the EB and WB I-10 off-ramp and other intersections along the detour route.

NB Indio Blvd. Bridge Demolition

Beginning on May 1 and continuing until May 5, the NB Indio Blvd. bridge over the I-10 Freeway will be demolished. This work will require a complete shutdown of I-10 Freeway at the Jefferson Street offramps.  The freeway shutdown is scheduled to begin each night Monday through Wednesday at 8:00 PM and continue until 6:00 AM. On Thursday and Friday, the freeway shutdown will begin at 9 PM and will continue until 6:00 AM.  Available detour routes are shown below. Please make travel plans accordingly.

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Detour for full closure of EB I-10.

  1. Exit at Monroe St. and turn right.
  2. Left at Varner Rd./Ave. 42.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp.

Note: Traffic will be flagged through the EB and WB I-10 off-ramp and other intersections along the detour route.

Jefferson Interchange Notice of Work, 4/17/17 – 4/19/17

Ramp closures will take place on I-10 at Jefferson Street April 17 - 19. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp night:

Nights of Monday through Wednesday, April 17 - 19, 2017. 9:00 PM - 6:00 AM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

 

Lane closures will take place on I-10 at Jefferson Street April 17 - 19. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night full closure of EB I-10.

Nights of Monday through Wednesday, April 17 - 19, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Monday through Wednesday, April 17 - 19, 2017. 10:00pm - 6:00am

Night full closure of WB I-10.

Nights of Monday through Wednesday, April 17 - 19, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Monday through Wednesday, April 17 - 19, 2017. 10:00pm - 6:00am

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Note: Traffic will be flagged through the EB I-10 off-ramp and other intersections along the detour route.

Detour for full closure of EB I-10.

  1. Exit at Monroe St. and turn right.
  2. Left at Varner Rd./Ave. 42.
  3. Left on Jefferson St.

Right on Jefferson St. WB on-ramp.

 

Ramp closures will take place on I-10 at Jefferson Street April 17 - 19. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Nights of Tuesday through Wednesday, April 18 - 19, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Monday through Wednesday, April 17 - 19, 2017. 9:00 PM - 6:00 AM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.

Turn left at the EB I-10 on-ramp.

Jefferson Interchange Notice of Work, 4/10/17 – 4/12/17

Ramp closures will take place on I-10 at Jefferson Street April 10 - 12. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Wednesday, April 10 - 12, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Night of Wednesday, April 12, 2017. 9:00 PM - 7:00 AM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

 

Ramp Closures will take place on the I-10 at Jefferson Street for the 3 weekends of the Indio Music Festivals. These closures will improve the ingress and egress of traffic to and from the festivals.

Closure Schedule

EB and WB on-ramps:

Continuous closure Wednesday 8:00PM to Monday 8:00 PM

These closures will be in place for 3 weekends: April 12 -17, 2017, April 19 - 24, and April 26 - May 1

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. NB Indio Blvd. traffic will use new WB I-10 Loop on-ramp.

All other traffic should continue on Varner Rd. to Washington St. WB on-ramp.

 

Added WB loop on-ramp closure

Ramp closures will take place on I-10 at Jefferson Street April 10 - 12. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Wednesday, April 10 - 12, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Night of Wednesday, April 12, 2017. 9:00 PM - 7:00 AM

WB loop on-ramp day:

Monday through Wednesday, April 10 - 12, 2017. 5:00 AM - 5:00 PM

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of WB I-10 loop On-ramp at Jefferson St.

Use existing WB I-10 on-ramp.

Jefferson Interchange Notice of Work, 4/3/17 – 4/7/17

Ramp closures will take place on I-10 at Jefferson Street April 3 - 7. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, April 3 - 7, 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Monday through Friday, April 3 - 7, 2017. 9:00 PM - 6:00 AM

EB off-ramp night:

Nights of Monday through Friday, April 3 - 7, 2017. 9:00 PM - 6:00 AM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street April 3 - 7. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night full closure of EB I-10.

Nights of Monday through Friday, April 3 - 7, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Monday through Friday, April 3 - 7, 2017. 10:00pm - 6:00am

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Note: Traffic will be flagged through the EB I-10 off-ramp and other intersections along the detour route.

Jefferson Interchange Notice of Work, 3/26/17 – 3/30/17

On March 30, 2017, the temporary WB off-ramp at Jefferson St. will be permanently closed. At the same time, the final WB off-ramp will be opened along with the WB loop on-ramp.

Note: there will be a new signal at the intersection of Jefferson St. and the new ramps.

 

Ramp closures will take place on I-10 at Jefferson Street March 26 - 30. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

WB on-ramp day:

Monday through Wednesday, March 27 - 29, 2017. 12:00 AM - 12:00 AM (72 hour closure)

Thursday, March 30, 2017. 12:01 AM - 12:00 AM (24 hour closure)

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street March 26 - 30. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night full closure of WB I-10.

Nights of Sunday through Thursday, March 26 - 30, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Sunday through Thursday, March 26 - 30, 2017. 10:00pm - 6:00am

Detour for full closure of WB I-10.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave 42.
  3. Left on Jefferson St.

Right on Jefferson St. WB on-ramp.

Jefferson Interchange Notice of Work, 3/20/17 – 3/24/17

Ramp closures will take place on I-10 at Jefferson Street March 20 - 24. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, March 20 - 24 2017. 5:00 AM - 5:00 PM

EB on-ramp night:

Nights of Wednesday through Friday, March 22 - 24, 2017. 9:00 PM - 6:00 AM

EB off-ramp night:

Nights of Wednesday through Friday, March 22 - 24, 2017. 9:00 PM - 6:00 AM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street March 22 - 24. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night full closure of EB I-10.

Nights of Wednesday through Friday, March 22 - 24, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Wednesday through Friday, March 22 - 24, 2017. 10:00pm - 6:00am

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Note: Traffic will be flagged through the EB I-10 off-ramp and other intersections along the detour route.

Jefferson Interchange Notice of Work, 3/13/17 – 3/17/17

Ramp closures will take place on I-10 at Jefferson Street March 13 - 17. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, March 13 - 17, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, March 13 - 17, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, March 13 - 17, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, March 13 - 17, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

Jefferson Interchange Notice of Work, 3/6/17 – 3/10/17

Ramp closures will take place on I-10 at Jefferson Street March 6 - 10. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, March 6 - 10, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, March 6 - 10, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, March 6 - 10, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, March 6 - 10, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

Jefferson Interchange Notice of Work, 2/27/17 – 3/3/17

Ramp closures will take place on I-10 at Jefferson Street February 27 - March 3. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, February 27 - March 3, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, February 27 - March 3, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, February 27 - March 3, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, February 27 - March 3, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

Jefferson Interchange Notice of Work, 2/22/17 – 2/24/17

Ramp closures will take place on I-10 at Jefferson Street February 22 - 24. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Wednesday through Friday, February 22 - 24, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Wednesday through Friday, February 22 - 24, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Wednesday through Friday, February 22 - 24, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Wednesday through Friday, February 22 - 24, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street February 22 - 24. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night alternating lane closure of WB I-10.

Nights of Wednesday through Friday, February 22 - 24, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Wednesday through Friday, February 22 - 24, 2017. 10:00pm - 6:00am

Jefferson Interchange Notice of Work, 2/13/17 – 2/17/17

Lane closures will take place on I-10 at Jefferson Street February 13 - 17. The purpose of these closures is to continue bridge and roadway construction activities.

Closure

Night alternating lane closure of WB I-10.

Nights of Friday through Friday, February 13 - 17, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Friday through Friday, February 13 - 17, 2017. 10:00pm - 6:00am

Night full closure of WB I-10.

Nights of Friday through Thursday, February 13 - 16, 2017. 10:00pm - 6:00am

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

 

Ramp closures will take place on I-10 at Jefferson Street February 13 - 17. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, February 13 - 17, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, February 13 - 17, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, February 13 - 17, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, February 13 - 17, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

Jefferson Interchange Notice of Work, 2/6/17 – 2/10/17

Ramp closures will take place on I-10 at Jefferson Street February 6 - 10. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, February 6 - 10, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, February 6 - 10, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, February 6 - 10, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, February 6 - 10, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street February 6 - 10. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Night alternating lane closure of WB I-10.

Nights of Friday through Friday, February 6 - 10, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Friday through Friday, February 6 - 10, 2017. 10:00pm - 6:00am

Jefferson Interchange Notice of Work, 1/30/17 – 2/3/17

Ramp closures will take place on I-10 at Jefferson Street January 30 - February 3. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, January 30 - February 3, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, January 30 - February 3, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, January 30 - February 3, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, January 30 - February 3, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.
  2. Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street January 30 - February 3. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Nights of Friday through Friday, January 30 - February 3, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Friday through Friday, January 30 - February 3, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Nights of Friday through Friday, January 30 - February 3, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Friday through Friday, January 30 - February 3, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 1/23/17 – 1/27/17

Ramp closures will take place on I-10 at Jefferson Street January 23 - 27. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, January 23 - 27, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Monday through Friday, January 23 - 27, 2017. 5:00 AM - 5:00 PM

WB on-ramp day:

Monday through Friday, January 23 - 27, 2017. 5:00 AM - 5:00 PM

WB off-ramp day:

Monday through Friday, January 23 - 27, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

  1. Continue on Varner Rd. to Washington St. on-ramp.

Detour for closure of WB I-10 Off-ramp at Jefferson St.

  1. Exit at Monroe St. and turn right.

Turn left at Varner Rd./Ave. 42.

 

Lane closures will take place on I-10 at Jefferson Street January 23 - 27. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Nights of Friday through Friday, January 23 - 27, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Nights of Friday through Friday, January 23 - 27, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Nights of Friday through Friday, January 23 - 27, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Nights of Friday through Friday, January 23 - 27, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Northbound Indio Blvd. Opening January 16

Northbound Indio Blvd. will reopen today, January 16, 2017 at 6:00 pm. Traffic will now be redirected onto the new Jefferson St. bridge.

Jefferson Interchange Notice of Work, 1/18/17 – 1/20/17

Ramp closures will take place on I-10 at Jefferson Street January 18 - 20. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Wednesday through Friday, January 18 - 20, 2017. 5:00 AM - 5:00 PM

EB off-ramp day:

Wednesday through Friday, January 18 - 20, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street January 18 - 20. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Night of Wednesday through Friday, January 18 - 20, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Night of Wednesday through Friday, January 18 - 20, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Night of Wednesday through Friday, January 18 - 20, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

NNight of Wednesday through Friday, January 18 - 20, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 1/9/17 – 1/13/17 *UPDATE*

** The opening of the new Jefferson St. Bridge has been delayed until Monday, January 16 at 4:00pm due to rain**

 

Northbound Indio Blvd. has been closed this week (January 9 - 13, 2017) to allow crews to construct connection pavement to facilitate the traffic switch from the old NB Indio Blvd. bridge to the new Jefferson St. Bridge. The new Jefferson St. Bridge will open to traffic this Friday, January 13, 2017. This is a map of the new street layout.

See Map Here

The new Westbound on-ramp from Northbound Indio Blvd. will not be open until Wednesday, January 18, 2017.

Detour for NB Indio Blvd. to WB I-10

  1. Northbound Indio Blvd.
  2. Left on Varner Rd.
  3. Left on Jefferson St. Old Bridge
  4. Right on Westbound I-10 on-ramp

See Map Here

 

Ramp closures will take place on I-10 at Jefferson Street January 9 - 13. The purpose of these closures is to  continue bridge and roadway construction activities.

Closure Schedule

EB on-ramp day:

Monday through Friday, January 9 - 13, 2017. 5:00 AM - 4:00 PM

EB off-ramp day:

Thursday and Friday, January 12 - 13, 2017. 5:00 AM - 5:00 PM

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street January 9 - 13. The purpose of these closures is to continue bridge and roadway construction activities.

Closure Schedule

Alternate 1

Night full closure of EB I-10.

Night of Monday through Friday, January 9 - 13, 2017. 10:00pm - 6:00am

Night alternating lane closure of WB I-10.

Night of Monday through Friday, January 9 - 13, 2017. 10:00pm - 6:00am

Alternate 2

Night full closure of WB I-10.

Night of Monday through Friday, January 9 - 13, 2017. 10:00pm - 6:00am

Night alternating lane closure of EB I-10.

Night of Monday through Friday, January 9 - 13, 2017. 10:00pm - 6:00am

Note: Only one alternative will be used each night.

Detour for full closure of EB I-10.

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing
  3. Right on Varner Rd.
  4. Right on Monroe St.
  5. Left on EB I-10 on-ramp at Monroe St.

Note: Traffic will be flagged through the EB I-10 off-ramp and other intersections along the detour route.

Detour for full closure of WB I-10.

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on Jefferson St.
  4. Right on Jefferson St. WB on-ramp

Note: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.