Jefferson Interchange Notice of Work, 1/9/16

Ramp closures will take place on I-10 at Jefferson Street January 9. The purpose of these closures is to allow placement of new roadway pavement at the new on/off ramp locations.

Closure Schedule

Date: Saturday. January 9, 2016
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St. and full closure of WB on-ramp at Jefferson St.

Note: Due to inclement weather this week, the Contractor is forced to work this Saturday to maintain the project schedule.

Detour for closure of WB I-10 On-ramp at Jefferson St.

Continue on Varner Rd. to Washington St. on-ramp.

Being Prepared For An Earthquake

From those of us who have lived through a major earthquake, to our friends and neighbors who have not, here is what we experienced and know we all need to have on hand.

1. We heard the blinds rattle, the dogs woke up and the whole house began to shake as if it were on a giant jack hammer. We ran to the doorway.
2. The house shook so badly all the food and dishes in the cabinets fell out onto the kitchen floor making a horrible, cracked glass and food mix.
3. The huge TV in our daughter's bedroom was tossed across the floor and lodged in front of the door. She could not get out.
4. There were huge cracks in all the walls.
5. Our dogs were thrown across the room. One hit the wall with a large thud. They were terrified.
6. When it finally stopped, we did not know what had happened. We thought we had been bombed. It was not until we could get to the car radio that we knew there had been an earthquake.
7. There was no electricity, no TV, no cell phone communication.
8. Neighbors came out into the street. Afraid to go back inside their homes. Stunned, not sure what to do.
9. We got in the car that was in the driveway (we couldn't get the other one out as the garage door didn't work with no electricity) and drove around -- not a smart thing to do but we did not know. It was deadly silent everywhere. Nothing was open. Banks were wide open with windows smashes to smithereens. There were fires and devastated buildings. We could smell gas.
10. We had no water. The commodes needed water to flush.
11. When we did get water through our home, we could not drink it because it was contaminated. And there was no gas to heat and purify it.
12. Electrical power lines were down and crackling in the street.
13. There were many, many aftershocks. And for each one it was as frightening all over again.
14. The second day, the electricity finally came back on and we listened to the local news.

It took 1 day for the Salvation Army to come to a local park where people were sleeping because they were too afraid to go in their homes or they had been destroyed. They brought water and toiletries.

The local market opened, but you could only buy if you had cash because all the automated cash registers were down.

We could not get cash from the bank ATMs, they were down,

It took 3 days for the Red Cross to show up.

So here is what we have in our earthquake kit:
1. A heavy duty flashlight
2. Tennis shoes for walking over cracked glass
3. A wind up radio that doesn't require electricity = so we know where we can and can't go.
4. Emergency blankets that would let us sleep outside on the golf course if needed.
5. Light sticks (candles can't be used due to gas line issues that may appears)
6. Plenty of dog food for our dogs.
7. Food in the pantry that doesn't require cooking -- packaged tuna, bread, beans, etc.
8. $200 in cash at all times.
9. We never let our gas tank get below 1/2 full.
10. Plenty of bottled water.
11. Home medical kit for cuts and wounds
12. Jeans and sweatshirts.

Be prepared. We didn't think it would happen to us, but it did. Be prepared. The earthquake we felt this morning was a 4.5. We lived through a 6.7. Earthquakes are felt exponentially.

Don't count on anyone being able to help you for at least 3 days.

And remember to check on your neighbors. If there is a major earthquake, we will all need each other.

Jefferson Interchange Notice of Work, 1/6/16 – 1/8/16

Ramp closures will take place on I-10 at Jefferson Street January 6 - 8. The purpose of these closures is to allow placement of new roadway pavement at the new on/off ramp locations.

Closure Schedule

Date: Wednesday to Friday. January 6 - 8, 2016
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St. and full closure of WB on-ramp at Jefferson St.

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Detour for closure of WB I-10 On-ramp at Jefferson St.

Continue on Varner Rd. to Washington St. on-ramp.

CERT Flood Response

Throughout the county the County of Riverside Emergency Management Dept. will be conducting a new CERT Flood Response advance class in preparation for the impending El Niño .

All CERT graduates are welcome to attend.

ATTENDEES MUST BRING THEIR OWN PPE - Personal Protective Equipment

EAST COUNTY:
Saturday January 9th 2016
RIVERSIDE COUNTY EAST COUNTY EMERGENCY OPERATIONS
82-695 Dr. Carreon Drive
Indio, CA  92201

REGISTRATION LINK:

https://events.r20.constantcontact.com/register/eventReg?oeidk=a07ebykk4c282f71f02&oseq=&c=&ch

Indio Looking for Sustainability Commission Members

The City of Indio is accepting applications for a position on the Sustainability Commission. The Sustainability Commission will work to identify and prioritize sustainability projects throughout the City. This Commission will also make recommendations to the City Council regarding sustainability plans and actions.

Anyone interested in serving on a City Commission must be a resident of the city of Indio and is invited to complete a City application. You may obtain an application from the office of the City Clerk at City Hall at 100 Civic Center Mall, Indio, CA 92201; telephone 760-391-4006 and chernand@indio.org.

The city application must be returned to the City Clerk by January 5, 2016

Burglary and Thefts in the Valley (Part 2)

Just recently I sent out a notice regarding an increase in residential burglaries and thefts here in the Valley.

Unfortunately, that activity continues to be a problem with two more communities reporting several burglaries, thefts and stolen vehicles. So far we have not experienced these problems here at Sun City Shadow Hills but we are by no means exempt.

I would encourage everyone to be aware of their surroundings at all times. If you notice anything out of the ordinary; people who don’t seem to belong or vehicles driving particularly slowly through a neighborhood, notify security. If you notice a “new” vendor at a neighbor’s residence call them to make sure they belong. If at any time you fear for your safety or the safety of others call 911.

We don’t need to be paranoid about these things, but we do need to step up our personal awareness concerning who is on our property. The safety and security of our person and property is everyone’s responsibility. Let’s be good neighbors and look out for one another and keep these punks out of SCSH.

David Archer
Community Safety Director
760-342-2850 ex 202

Jefferson Interchange Notice of Work, 12/9/15

Lane closures will take place on I-10 at Jefferson Street December 9. The purpose of these closures is to place concrete pavement on the new EB auxiliary lane and off ramp.

Closure Schedule

Date: Wednesday night. December 9, 2015
Time: 8:00 PM - 6:00 AM

Closures:

Alternating lane closures of EB I-10. Closure of EB off-ramp at Jefferson St.

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Jefferson Interchange Notice of Work, 12/7/15 – 12/11/2015

All full closures have been cancelled for this week.

Lane closures will take place on I-10 at Jefferson Street December 7 - 11.The purpose of these closures is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday to Friday, December 7 - 22, 2015 CANCELLED
Time: 10:00 PM - 6:00 AM CANCELLED
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 12/7/15

Full closure of WB I-10 and WB on-ramp at Jefferson Street will take place on December 7. The purpose of these closures is to allow construction crews to construct an auxiliary lane at the WB on-ramp.

Closure Schedule

Date: Monday night. December 7, 2015
Time: 10:00 PM - 6:00 AM

Closures:

Full closure of WB I-10. Closure of WB on-ramp at Jefferson St.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on WB on-ramp at Washington St.

Notes: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 12/9/15

Full closure of WB I-10 and WB on-ramp at Jefferson Street will take place on December 9. The purpose of these closures is to allow construction crews to construct an auxiliary lane at the WB on-ramp.

Closure Schedule

Date: Monday night. December 9, 2015
Time: 10:00 PM - 6:00 AM

Closures:

Full closure of WB I-10. Closure of WB on-ramp at Jefferson St.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on WB on-ramp at Washington St.

Notes: Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 11/30/15 – 12/4/15

**Update**  Closures for Monday through Wednesday have been cancelled.

Ramp closures will take place on I-10 at Jefferson Street November 30 - December 4. The purpose of these closures is to allow bridge construction work to continue.

Closure Schedule

Date: Monday to Friday. November 30 - December 4, 2015
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St.

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

Lane closures will take place on I-10 at Jefferson Street November 30 - December 4.The purpose of these closures is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday to Friday, November 30 - December 4, 2015
Time: 10:00 PM - 6:00 AM
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Note: Friday closures will not be implemented except as a contingency to complete work delayed by weather events to keep the project on schedule.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 11/23/15 – 11/24/15

Ramp closures will take place on I-10 at Jefferson Street November 23 - 24 The purpose of these closures is to allow bridge construction work to continue.

Closure Schedule

Date: Monday to Friday. November 23 - 24, 2015
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.


Lane closures will take place on I-10 at Jefferson Street November 23 - 24.The purpose of these closures is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday to Tuesday. November 23 - 24, 2015
Time: 10:00 PM - 6:00 AM
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 11/16/15 – 11/20/15 (CANCELLED)

** All off-ramp closures and on-ramp closures for Monday and Tuesday have been canceled **

Ramp closures will take place on I-10 at Jefferson Street November 16 - 20 The purpose of these closures is to allow bridge construction work to continue.

Closure Schedule

Date: Monday to Friday. November 16 - 20, 2015
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

 

**Freeway closures have been canceled.**

Lane closures will take place on I-10 at Jefferson Street November 16 - 20.The purpose of these closures is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday to Friday. November 16 - 20, 2015
Time: 10:00 PM - 6:00 AM
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 11/9/15, 11/12/15, 11/13/15

Ramp closures will take place on I-10 at Jefferson Street November 9, 12, and 13. The purpose of this closure is to allow bridge construction work to continue.

Closure Schedule

Date: Monday, Thursday, Friday. November 9, 12, 13, 2015
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.

Turn left at Ave. 42/Varner Rd. back to Jefferson St.


Lane closures will take place on I-10 at Jefferson Street November 9, 12, and 13.The purpose of this closure is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday, Thursday, Friday. November 9, 12, 13, 2015
Time: 10:00 PM - 6:00 AM
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Jefferson Interchange Notice of Work, 11/2/15 – 11/6/15

Ramp closures will take place on I-10 at Jefferson Street November 2 - 6. The purpose of this closure is to allow bridge construction work to continue.

Closure Schedule

Date: Monday to Friday. November 2 - 6, 2015
Time: 6:00 AM - 4:00 PM
Closures: Full closure of EB on-ramp and off-ramp at Jefferson St.

Detour for closure of EB I-10 On-ramp at Jefferson St.

  1. Go east on Varner Rd. to Monroe St.
  2. Turn right at Monroe St.
  3. Turn left at the EB I-10 on-ramp

Detour for closure of EB I-10 Off-ramp at Jefferson St.

  1. Go east on I-10 and exit at Monroe St.
  2. Turn left at Monroe St.
  3. Turn left at Ave. 42/Varner Rd. back to Jefferson St.

Lane closures will take place on I-10 at Jefferson Street November 2 - 6.The purpose of this closure is to allow construction crews to place forms and reinforcement for bridge construction over the EB and WB I-10.

Closure Schedule

Date: Nights of Monday to Friday. November 2 - 6, 2015
Time: 10:00 PM - 6:00 AM
Closures:

Alternate 1: Full closure of EB I-10. Closure of 1 and 2 lanes on WB 1-10.

Alternate 2: Full closure of WB I-10. Closure of 1 and 2 lanes on EB I-10.

Note: Alternate 1 and Alternate 2 will never be implemented simultaneously.

Detour for full closure of EB I-10 at Jefferson Street Interchange

  1. Take the EB I-10 off-ramp at Jefferson St.
  2. Left on existing Jefferson over-crossing.
  3. Right on EB I-10 on-ramp at Jefferson St.

Notes:

Traffic will be flagged through the EB I-10 off-ramp.

Detour for full closure of WB I-10 at Jefferson Street Interchange

  1. Take the temporary WB I-10 off-ramp at Jefferson St.
  2. Left on Varner Rd.
  3. Left on existing Jefferson over-crossing.
  4. Right on WB I-10 on-ramp.

Notes:

Traffic will be flagged through the temporary WB I-10 off-ramp/Varner Rd. intersection.

Preparedness Meeting

September 21 at 6 PM at the Indio Library and September 22 at 11:50 AM at the Indio Senior Center.

Help Shape Indio

The City of Indio is currently in the process of updating its General Plan. The General Plan is a statemandated document that outlines goals, policies, and programs that provide the framework for future development in the city.

The General Plan will address land use, all modes of transportation, housing, safety, conservation, open space, noise, public health, sustainability, and economic development. To satisfy the requirements of the California Environmental Quality Act (CEQA), an Environmental Impact Report (EIR) is being prepared. You are being invited to share your comments as to the scope and content of the EIR.

Please attend an upcoming EIR scoping meeting to learn more about this process and provide your input. Refreshments will be provided.

DATE:                Thursday, August 20, 2015
TIME:                6:00 PM
LOCATION:    The Indio Teen Center
                                81678 Avenue 46
                                Indio, CA 92201

[gview file="http://www.scshca.com/wp-content/uploads/2015/08/Indio-EIR-Scoping-Meeting-Flyer.pdf"]

Jefferson Interchange Closures 8.10 – 8.14

Various closures will take place on I-10 at Jefferson Street between August 10th and 14th. The purpose of these closures is to allow construction crews to remove and reinstall bridge column forms and bar reinforcing steel in the median.

Closure Schedule

Dates: Nights of Monday - Thursday, August 10-13, 2015

Time: 10:00 PM - 6:00 AM

Closure: Number 1 and 2 lanes on I-10 in both directions at Jefferson

Street Interchange

Date: Night of Friday. August 14, 2015

Time: 10:00 PM - 6:00 AM

Closures: Full closure of EB I-10 at Jefferson Street Interchange and

Closure of number 1 and 2 lanes on WB I-10 at Jefferson Street Interchange

Detour for full closure of EB I-10 at Jefferson Street Interchange

Take the EB I-10 off-ramp at Indio Blvd.

Turn left towards Jefferson St. North.

Turn right at Varner Rd.

Turn right at Monroe St.

Turn left at the EB I-10 on-ramp.

Red Arrow Signal at Jefferson and Varner

After interested homeowners talked to a CHP officer at the Varner Barracks and the Jefferson Project construction office the traffic signal light at the corner of Jefferson and Varner has been changed from a red arrow, which is a full stop, to a solid red light, where you may make a right turn on red, after a full stop.

stop light-med

This will make our driving here easier. Previously, there was a red arrow signal at that intersection, causing confusion.

From the California Driver Handbook:

*Solid Red – A red signal light means “STOP.” You can make a right turn against a red light after you stop then yield to pedestrians, bicyclists, and vehicles close enough to be a hazard. Make the right turn only when it is safe. Do not turn if a “NO TURN ON RED” sign is posted.

* Red Arrow – A red arrow means “STOP.” Remain stopped until the green signal or green arrow appears. Do not turn against a red arrow. There may not be a “No Turn on Red” sign at the intersection, but that doesn’t mean that you can make a right on a red arrow. Drivers must wait until the arrow changes to make a right.

If you want to communicate with the Jefferson Project, use the Contact Form or phone number at this website:

http://i10cvcprojects.com/contact/

Jefferson Interchange Notice of Work – July 6, 2015

Nighttime work and lane closures on I-10 at Jefferson Street Interchange

Beginning July 6th, construction crews will be performing nighttime work and lane closures on I-10 at the Jefferson Street Interchange. This work will last through July 14th. The purpose of this work is to place k-rail, re-stripe I-10 and shift traffic.

CLOSURE SCHEDULE

Nights of July 6 and July 7 (10:00 PM – 6:00 AM)

  • Re­-stripe I­-10 in both directions and shift traffic towards median.

Nights of July 8 and July 9 (10:00 PM – 6:00 AM)

  • Place K-­rail on westbound side of I­-10

Nights of July 13 and July 14 (10:00 PM – 6:00 AM)

  • Place K-­rail on eastbound side of I­-10

DETOURS

No detours are necessary for these closures. At least one lane will be open in each direction at all times.