Golf Weekly Status Report 5/27/15 – 6/3/16

South Course

Projects Scheduled

  • Separate irrigation stations 25 & 36 on #9 fairway
  • Operation of Ground Quake on isolated bare areas front nine
  • Sod bare areas hole number 7 next to houses
  • Remove dead palm tree by driving range practice bunker

Current Projects

  • Operation of ground Quake machine starting on holes #12 & #15
  • Seed Princess Bermuda in bare areas on fairways 1st. application this will be done over the next three months
  • Third pass of solid tine aerification on fairways
  • Planet Air all putting greens

 Completed Projects

  • Second pass aerification on all tees
  • Add sand and fix drainage on practice driving range bunker
  • Edge cart paths starting #18 backwards
  • Redesign irrigation #9 tee

North Course

Projects Scheduled

  • Edge around tees
  • Solid tine aerify tees 1-18
  • Solid tine fairways 1-18
  • Granular fertilize greens 1-18

Current Projects

  • Herbicide application in landscape beds holes 5 - 10
  • Granular fertilization of tees and fairways
  • Aerify and top dress bare area #14 green
  • Edge irrigation heads starting on hole #18 backward

Completed Projects

  • Spiking of fairways
  • Hand removal of larger weeds holes 13 – 15
  • Verticut and top dress bare area #14 green
  • Edge landscape beds around clubhouse and tees 1 – 4
  • Edge irrigation heads starting on hole #18 backwards
  • Lowering of rough cut from 1 ½ to 1 ¼  (Could possibly generate some clippings)
  • Hand removal of larger weeds holes 15 - 18