South Course
Projects Scheduled
- Separate irrigation stations 25 & 36 on #9 fairway
- Operation of Ground Quake on isolated bare areas front nine
- Sod bare areas hole number 7 next to houses
- Remove dead palm tree by driving range practice bunker
Current Projects
- Operation of ground Quake machine starting on holes #12 & #15
- Seed Princess Bermuda in bare areas on fairways 1st. application this will be done over the next three months
- Third pass of solid tine aerification on fairways
- Planet Air all putting greens
Completed Projects
- Second pass aerification on all tees
- Add sand and fix drainage on practice driving range bunker
- Edge cart paths starting #18 backwards
- Redesign irrigation #9 tee
North Course
Projects Scheduled
- Edge around tees
- Solid tine aerify tees 1-18
- Solid tine fairways 1-18
- Granular fertilize greens 1-18
Current Projects
- Herbicide application in landscape beds holes 5 - 10
- Granular fertilization of tees and fairways
- Aerify and top dress bare area #14 green
- Edge irrigation heads starting on hole #18 backward
Completed Projects
- Spiking of fairways
- Hand removal of larger weeds holes 13 – 15
- Verticut and top dress bare area #14 green
- Edge landscape beds around clubhouse and tees 1 – 4
- Edge irrigation heads starting on hole #18 backwards
- Lowering of rough cut from 1 ½ to 1 ¼ (Could possibly generate some clippings)
- Hand removal of larger weeds holes 15 - 18