Double Dump Trucks on Avenue 40

The CVWD North Basin project and the CVWD Avenue 40 storm drain projects are requiring a massive number of 18-wheel double-dump trucks to haul away the excavated dirt. The trucks use Avenue 40 both east and westbound and travel fully loaded at high speeds passing all Avenue 40 gate entrances, and the Shadows driveway entrance, and when crossing Jefferson Street. Please USE EXTREME CAUTION when entering the Avenue 40 roadway from any location to avoid a collision with one of these trucks. This will continue for several more weeks or months.